K
KICKRIG WELL CONTROL SIMULATOR
DEVELOPMENT α 0.111.0
SURFACE STACK / LAND RIG

Unexpected pressure

00:00
RIG LIBRARYBear 4ETraining floor · representative layout
BEAR 4E · DC / SCR TRIPLE
BEAR 4E / TRAINING FLOOR

Step onto the floor.

Representative surface-stack training floor

↔ Drag to look · Arrow keys / WASD to walkClick a panel control
CREW / ROUTINEFLARE / PILOT
3D RIG FLOOR
00:00

OBSERVATIONS / NEXT STEP

GO TO

Well-control practice

NEW LESSON
FREE PRACTICE

Learn the floor. Read the well.

Choose a guided lesson to practice kick recognition, containment, pressure handover and kill circulation. Starting a lesson creates a new run.

    CIRCULATION—
    PUMP STROKES0
    TARGET GAUGE—
    STEADY-RATE REFERENCE— kPa
    SURFACE-STACK EXERCISE KILL SHEET

    Model SCR estimate: — kPa at selected rate

    KILL MUD—kg/m³
    ICP—kPa
    FCP—kPa
    SURFACE → BIT—strokes

    Knowledge practice · controls remain manual. Operator procedures and validated equipment limits govern real well-control operations.

    Rig controls

    SIM TIME
    01

    Drilling

    0200 spm

    02

    Observe & position

    03

    BOP & choke line

    Annular preventer
    Pipe rams
    HCR choke-line valve
    04

    Choke & circulation

    ClosedFully open
    kg/m³

    A density change travels down the pipe and back up the annulus.

    Action timeline

    AUTOMATIC SESSION RECORD

    Well sheet

    Casing shoe
    2,100 m TVD
    Hole / pipe OD
    216 / 127 mm
    Pump output
    13.5 L/stroke
    Annulus capacity
    — m³
    SIMULATION LAB